vdv-sound-and-communications-norcal-logo-hrz-kovdv-sound-and-communications-norcal-logo-hrz-kovdv-sound-and-communications-norcal-logo-hrz-kovdv-sound-and-communications-norcal-logo-hrz-ko
  • Home
  • About Us
    • What We Do
    • Who We Are
    • Why Hire NECA-IBEW
    • History
    • Important Links
    • The VDV Logo
  • Contractor Directory
  • Careers
    • Apprenticeship Program
    • Online Apprenticeship Application
    • Certification Tests
    • Continuing Education
  • In The News
  • Featured Projects
  • Contact Us
    • IBEW Chapters
    • NECA Chapters
    • VDV Wage Schedule Map

CH Reynolds Data Division completed the 3,500-sq.-ft. data center build-out for BOX in less than 30 days.

CH Reynolds built out seismic bracing for the entire data center, including 45-degree angle support to the ceiling throughout the entire grid system.

CH Reynolds wired LAN, SAN and KVM switches and the fiber and copper backbone cabling from the Main Distribution Area (MDA).

    CH Reynolds Builds Out The New BOX Data Center In Santa Clara


    CH Reynolds Electric recently completed its fourth data center build-out for BOX, at the company’s new colocation in CoreSite, Santa Clara. The 3,500-sq.-ft. Data Center build-out included cabling the main distribution area, the horizontal distribution area, and the equipment distribution area.

    The solution involved CAT 6A copper, OM4 and Singlemode fiber for backbone and horizontal cabling. CH Reynolds used a Panduit connectivity solution for the network cabling system and Anixter as a distribution partner.

    The Data Center’s design included installation of cabinets and ladder racks, in addition to a complete structured cabling system. California has implemented new bracing laws for earthquakes, so CH Reynolds built out seismic bracing for the entire data center, including 45-degree angle support to the ceiling throughout the entire grid system.

    With the fast-track nature of this job, the International Brotherhood of Electrical Workers (IBEW) Local 332 in San Jose played a critical role in supplying technicians for the project who were instrumental in its completion.

    CH Reynolds Project Team
    Owner:

    BOX Inc, CoreSite Co-location, Santa Clara

    Electrical Contractor:

    CH Reynolds Electric, Data Division, San Jose

    CH Reynolds Management Team:

    John Anderson, Sr. Vice President, Data Division, RCDD; Jason E. Bright, Sr. Vice President, Operations

    CH Reynolds Project Team:

    Gary Slater, Data Superintendent; Dan Stolpe, Project Engineer; Larry Duarte, Foreman

    Technicians:

    International Brotherhood of Electrical Workers (IBEW), Local 332, San Jose; Arnulfo Tamez, Installer; Jonathan Kennedy, Installer; Gus Arias, Installer; Joseph Garcia, Installer; Rocky Cao, Apprentice

    Share
    NorCal VDV Logo

    1493 Park Avenue,
    San Jose, CA 95126

    (408) 288-6100

    About Us

    WORLD-CLASS TECHNOLOGY REQUIRES WORLD CLASS CONNECTIVITY | Union Contractors (IBEW/NECA) in Sound & Communications combine a skilled and trained work force with world class technology. For the best installations in voice/data/cabling, network systems, data center facilities, Audio Video systems, sound systems, fiber optics, security systems, fire/life safety systems, & CATV, call a union contractor.